Coastal Services
Case Studies
Cement Silo Staircases
Fabricating and installing two 30m+ structural stair sets.
  • LocationPort of Wellington and Port Taranaki
  • ServiceFabrication and Installation
  • Key MaterialsFabricated Steel
  • Joint project withGolden Bay Cement
Mud Control System
Fabrication on the mud tank system.
  • LocationTaranaki
  • ServiceFabrication
  • Key MaterialsPressure Piping Structural Steel Mechanical Components
  • Proudly SupportingDFE Limited